High Water Recharge Rate brings Allana’s ambitious Targets Closer to Reach

HotspringsOn January 7, Allana Potash (‘Allana’, TSX: AAA) announced that it has delineated a significant water source with very high annual recharge rates as established by ongoing hydro-geological research in the alluvial fan. Water supply is essential to Allana because its Dallol project is based on solution mining. A test well in the western alluvial fan area has been operational since last September. The preliminary pump tests have already shown an average 70 cubic meter flow rate, sometimes reaching 150 cubic meters, confirming the presence of a fresh water aquifer in the alluvial fans along the western boundary of the Allana license area.

Fugro Consult GmbH (‘Fugro’ a geological services consultancy) has now estimated recharge rates of the 160 million m3 water reservoir based on data from observation wells since last March. The calculations suggest a recharge rate in the range of 35.7 million m3 and 55.2 million m3 annually for the Allana license areas. Given that Allana expects annual water use to be in the order of 16 million m3, the recharge rate is more than sufficient to meet the expanded annual production targets averaging 2-3 million tons of potash (MOP). Solution mining works by enabling the extraction of the mineral from the ground through the dissolving of water soluble minerals with underground water. Solution mining does not place personnel underground and thus does not have the risks inherent to underground mining. This solution is extracted from the earth and then processed to recover the mineral.

Allana said has targeted initial production at Dallol to be about 1 million metric tons of MOP per year starting in late 2014 or early 2015 then reaching peak levels (full production) approximately a year to 16 months after later. The confirmed availability of water confirms that the Dallol project is proceeding on schedule.

Allana Potash (Allana, TSX: AAA) is set to make the Company one of the first to market and largest potash producers in Africa. Allana has benefited from Ethiopian pro-investment policies, which have enabled the country to record one of the highest economic growth rates in the world (10%, expected to continue until 2015). In addition, the fact that the water resources that are both environmentally and commercially sustainable marks an important milestone for Allana’s timetable. Allana has a distinct advantage over competitors in Ethiopia (i.e. Yara International) and beyond Ethiopia’s borders in Eritrea.

Allana’s most recent NI 43-101 mineral resource estimate for the Dallol Potash Project has envisaged a production capacity of 1.3 billion tons at an average grade of 19.32% KCI (potassium chloride). The Dallol deposit has a strong record of historical exploration. The Dallol resource, as with much of the potash available in the Danakhil region is that there is an extensive sylvinite mineralization at very shallow levels. Allana will continue to focus the development of the shallow region, though it has already drilled in the deeper areas to establish the presence of potash there as well. Ethiopia has invested in infrastructure, promoting industry and doubling agricultural production. Project financing should be completed by mid-2013 in order to begin construction by the fall (or late) of 2013. Allana also has the potential to raise capacity to two or three million tons a year (MOP) and in addition have the ability to produce SOP. Today’s water announcement validates the ambitious production targets and schedule, bringing both further within reach.

Allana will ship its potash through the Republic of Djibouti, where a new port is being built in Tadjoura. Construction on the new port was officially launched just before the Christmas break in a joint ceremony attended by officials from Djibouti and Ethiopia. The port is scheduled to become operational by the end of 2015, adding to Ethiopia’s import and export capacity. Currently, goods move in and out from the Port of Djibouti and Dorhaleh container terminal; however, Allana will have its own terminal with unloading and storage facilities at the new port. The potash will be delivered to the port by truck along a new highway linking the Dallol project with the port, which is already under construction. The project is expected to cost USD$ 61 million to be covered by a loan from Kuwait based Arab Fund for Economic and Social Development (USD$ 36 million) and Saudi Fund for Development (USD$ 25 million).

This entry was posted in Potash & Phosphate Intel and tagged , , , , , by Alessandro Bruno. Bookmark the permalink.
Alessandro Bruno

About Alessandro Bruno

Alessandro is Senior Editor at ProEdgeWire. He holds a BA, MA. Alessandro has worked for the United Nations in Libya and specialized in Middle Eastern, African, and South American affairs. Alessandro has worked as an industry analyst, lived and worked abroad extensively and is fluent in English, Italian, Spanish and French with a working knowledge of Portuguese, Arabic and German.
Copyright © 2012 ProEdge Media Corp. All rights reserved. More & Disclaimer »

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Lead Sponsors

Video
ProEdgeWire Video
Something else
Cancel
REE World login
ProEdge Media
Copyright © 2012 ProEdge Media Corp. All rights reserved.

ProEdge Media Corp. text, photos, graphics and logos shall not be used for commercial purposes, reproduced, published, broadcast, rewritten for broadcast or publication or redistributed directly or indirectly in any medium. ProEdge Media Corp. shall not be held liable for any delays, inaccuracies, errors or omissions in any ProEdge Media Corp. original content, or for any actions taken in consequence. ProEdge Media Corp. materials may not be stored in whole or in part in a computer except for personal non-commercial use. As a newswire service ProEdge Media Corp. does not obtain release from the subjects, individuals, groups or entities contained in its photographs, graphics or quoted in its text. Further, no clearance is obtained from the owners of any trademarks or copyrighted material where the marks and material are included in ProEdge Media Corp. photos or content. You shall be solely responsible for obtaining any and all the necessary releases from whatever individual or entity is necessary for any of your uses of ProEdge Media Corp. material. You agree to indemnify ProEdge Media Corp. from any losses, damages and expenses (including reasonable attorney fees) it incurs as a result of any claim based on your use of its materials in violation of these terms.

Disclaimer: ProEdge Media Corp., owners and operators of the ProEdgeWire and affiliated sites, has established the following rules to ensure that there is no appearance of impropriety on the part of any ProEdge Editorial writers. The content of ProEdge Editorial articles are the opinion of the Writer and any reliance on the content of these articles is at your sole risk. Our Writers are not registered investment advisors. You should not make any kind of investment decision in relation to Articles or stocks discussed in them without obtaining advice from a registered investment advisor.

Facts relied upon by our Writers are generally provided by the subject companies or gathered by our Writers from other public and/or private sources. These facts may be in error and if so, the opinions of our Writers may be materially different. Often times ProEdge writers will utilize advertorial companies as content sources. This is because we represent many of the leading companies in various sectors covered in our sites. Our advertisers are publicly disclosed at all times and listed in alphabetical order on the right column of each affiliated section.

If you have any questions or concerns, please contact us directly at (416) 581-0177 or email us at Publisher@ProEdgeMedia.com

exit
REE Leaders Index
REE Leaders Index
 (Bloomberg Ticker: REEL)
REE Leaders Index